All 4 ACs verified, 7 tests pass, ruff clean. No issues found. Story status updated to done; no new deferred items. Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
1.1 KiB
Deferred Work Manifest
Tracks blocked, deferred, and tech-debt items across sprints.
Infrastructure / environment setup
[1-1] systemd unit installation
Story: 1-1-project-scaffold-and-verified-entry-points
Task: 7.1, 7.2
Description: Unit files created at systemd/. Must be symlinked or copied to /etc/systemd/system/ on the Pi and systemctl daemon-reload run before they take effect. Cannot be automated without root access to target device.
[1-1] Pi Zero 2W runtime verification
Story: 1-1-project-scaffold-and-verified-entry-points
Task: 9.1, 9.2
Description: Entry points verified on host (Pi 5, Linux). Full AC1 verification on Pi Zero 2W hardware requires physical deployment.
Story 1.2 review — no new deferred items
Story 1-2-configuration-read-write-wipe reviewed 2026-04-22. All 4 ACs pass, all 7 tests pass, ruff check and format clean. No deferred items required: config.write() already handles directory creation via mkdir(parents=True, exist_ok=True), so deployment to a fresh device with no /etc/planemapper/ directory is covered at runtime.