ux(provisioning): step 1 is now "Plug in power"

Frames will ship with the battery disconnected to preserve shelf life
— the setup screen polling is non-trivial draw on e-ink, and a unit
that sits on a shelf for weeks before unboxing would arrive flat.
Surface "plug in power" as the prerequisite step ahead of unlock and
scan, so the recipient can't miss it.

Step list grows from 4 to 5; pitch shrinks from 38 → 32 px to keep
the manual-help QR clear of the bottom edge.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
2026-05-09 13:41:49 -04:00
parent 1399cc3756
commit f1d867c659
5 changed files with 9 additions and 6 deletions
Binary file not shown.
Binary file not shown.

Before

Width:  |  Height:  |  Size: 13 KiB

After

Width:  |  Height:  |  Size: 13 KiB

Binary file not shown.
Binary file not shown.

Before

Width:  |  Height:  |  Size: 12 KiB

After

Width:  |  Height:  |  Size: 12 KiB